Accessorial Rules & Operational Schedule
Entity: Connecticut Freight, LLC · Specific dollar rates are confirmed per Rate Confirmation or Master Shipper Agreement.
Detention (Loading / Unloading)
Standard FTL quotes include 2.0 hours of free time at shipper and receiver for scheduled appointments. Detention beyond free time requires documented dock IN/OUT times on the BOL and timely pre-expiration dispatch notice.
Truck Order Not Used (TONU)
Applies when a dispatched load is cancelled after the motor carrier is already en route to pickup or has arrived at the origin dock.
Overnight Layover
Applies when shipper/receiver delays or missed appointment windows force an equipment hold overnight beyond scheduled hours.
Liftgate / Inside / Jobsite Delivery
Must be declared during RFQ intake. Unscheduled liftgate, residential, construction site, or non-dock deliveries incur carrier pass-through surcharges.
Tarping & Securement (Flatbed)
Smoke, lumber, or steel tarp requirements (4' / 6' / 8' drops) and extra dunnage/chain requests must be specified prior to Rate Confirmation.
Reweigh & Reclassification (LTL)
Weight or dimensional discrepancies verified by LTL carrier W&I terminals result in pass-through rebills plus carrier reweigh administrative fees.